The Herrada

The Herrada wind farm will have an installed capacity of 51 megawatts (MW), distributed in 10 wind turbines of 5.1 MW of unit capacity, and its commissioning will involve an investment of around 53 million euros. This wind farm will be capable of generating 149,000 megawatt hours (MWh) per year, enough to satisfy with clean electricity the consumption of around 56,000 homes in Castilla-La Mancha. It will also prevent the emission of 55,000 tons of CO2 per year.

LOCATION

The site selected for the development of the project is located in the municipality of Montealegre del Castillo (Albacete).

Coordinates

The geographic coordinates of the park's central point are:
Latitud: 38°51'44.4"N
Longitud: 1°20'14.9"O
Altitud: 817 m.s.n.m.

jobs

The construction industry creates 170 direct jobs during peak periods.

PIB

Contribution to PIB over its useful life equivalent to almost 1.4 million euros per year.

Plant data

The wind farm consists of several wind turbines with three-bladed wind turbines on the windward side, distributed in a row perpendicular to the prevailing the configuration of the terrain in a row perpendicular to the predominant wind direction. direction of the wind.
0
wind turbines
0 MVA
installed power
0 MWA
rated power
0 MWp
peak power

In Progress Herrada

The construction process of La Herrada.

"The Energy of People" Podcast

"The Energy of People'" is Capital Energy's podcast in which we give voice to stories full of energy and emotion. Will you join us?

Official Web Site

Feel the energy of the people, 'The Energy of the People' is a podcast with which we want to highlight the social aspect that makes our clean energy project stand out.

Montealegre del Castillo Episode

In this episode of The Energy of People we visit Montealegre del Castillo. A town in the province of Albacete that has made the rest industry one of its hallmarks.

Bonus Episode Montealegre del Castillo

The vineyards give life to the fields of the eastern part of Albacete. A life full of joy and hardship in equal parts. Working the land requires effort and dedication.

News about La Herrada

Find out what's going on in La Herrada.

Capital Energy purchases from Siemens Gamesa the wind turbines for its first wind farm in Castilla-La Mancha, La Herrada.

Capital Energy continues to take steps to strengthen the development of its clean energy project in Castilla-La Mancha with the acquisition of the wind turbines for its first wind farm in the region: La Herrada.
Read More

Capital Energy awards Gestacur the construction works for its first wind farm in La Herrada

Capital Energy has just closed the contract with Gestacur for the engineering, supply, construction, commissioning and refurbishment of the new facility.
Read More

Capital Energy signs the first agreement with the Montealegre City Council linked to its Territorios Project.

The company has signed the first collaboration agreement in the region linked to its Territorios Project with the Montealegre del Castillo City Council.
Read More